DA Form 7470-R — BACK-UP POWER SYSTEM INSPECTION CHECKLIST (LRA)

back-up power system inspection checklist (lra)

Download the form

Use DA Form 7470-R when you need to back-up power system inspection checklist (lra). Full title: BACK-UP POWER SYSTEM INSPECTION CHECKLIST (LRA). Everything you need is on this page — the file, the entry rules, the routing. Edition 08/01/2002, status ACTIVE, 1 page(s), roughly 200 fields.

Two references decide everything about your use of it: USACE maintains the content, TM 5-694 sets the trigger and the routing. Consult the directive when your case is not routine; otherwise the printed blocks tell you enough. The person named in the entries fills it, or the administrative office holding the file does it for them.

Pick by how you will enter data: PDF, XFDL on offer. Typing means fillable pdf, where the boxes accept keystrokes and hold them on save. Handwriting means printable pdf, a flat page image sent straight to a printer. Neither version changes what appears on the page.

Use a full pdf reader, not the browser viewer. Browser viewers display fields they cannot always save, and the loss shows up only when you reopen the file — type one entry, save, reopen, verify, then fill the rest. The xfdl file is IBM Lotus Forms, used inside Army systems, and opens in the Lotus Forms Viewer alone — no pdf reader, no word processor.

Nothing is charged and no sign-up applies. Files are served as published, without changes to the page image.

What the form asks for

  • ChkPt
  • Circuit
  • CondA
  • CondA_1
  • CondA_2
  • CondA_3
  • CondA_4
  • CondA_5
  • CondA_6
  • CondB
  • CondB_1
  • CondB_2
  • CondB_3
  • CondB_4
  • CondB_5
  • CondC
  • CondD
  • CondD_1
  • CondD_2
  • CondD_3
  • CondD_4
  • CondD_5
  • CondD_6
  • ContentArea1

The heading entries carry more weight than the body. Name spelled as in official records, identification number, organisation, date prepared. Retrieval runs on those values, so a transposed digit or a casual spelling costs someone a file search. Fill them before anything else.

Tab through the fields rather than clicking. The tab order was fixed when the form was built and generally follows the page, which catches boxes a mouse skips past. Check boxes and option buttons take a click, and an exclusive group clears the previous selection when you make a new one. Single-line fields do not wrap — text past the field width prints truncated while still showing in full on screen, which is why the loss is discovered after printing. Overflow goes to remarks or a continuation sheet. A field that does not apply gets the mark meaning none; blank space reads as an omission.

Signature comes after every other entry — ink or an approved electronic means, and without it the document is a draft. Where reviewing, approving or witnessing signatures are called for, take them in printed block order, each dated on the day applied. Before release, one pass from the top. The defects worth hunting are always the same four: mandatory fields left empty, identification digits transposed, dates with day and month reversed, and stale data surviving in a copy reused in place of a blank form.

Privacy Act statement first, personal entries second. The notice covers who is authorised to collect, why, who else routinely sees it, and whether you must answer. After completion the file carries personal data and is stored and sent under the corresponding safeguards.

Send it where the directive says: the office it names, the unit administrative channel, or the individual's file. Take your copy before submission. How long the record is held comes from the schedule for the series, not from the office holding it.

Companion documents come from the same series and number scheme. Within the DA series, a shared proponent or a shared directive usually means shared use, and a form cited on the face of another accompanies it. Gather the whole package first — continuation sheets, cover sheets, transmittals.

Edition date is the version number, printed on the page. Hold a locally saved copy against the current edition before reuse, since nothing on your machine signals a revision. Work already executed under a superseded edition remains as filed.

What is distributed here are reproductions of published Department of the Army documents. Independent site, no official standing, no forms of its own. Nothing on the page constitutes legal advice, and acceptance by any office is outside what can be stated. Put questions about entries, requirements or eligibility to USACE or your servicing administrative office.

Questions and answers

What is DA Form 7470-R?
BACK-UP POWER SYSTEM INSPECTION CHECKLIST (LRA)
Which edition is current?
08/01/2002
Who is responsible for this form?
USACE
In which formats can it be downloaded?
PDF, XFDL, PDF

Publisher notes

  1. 41-ITEM ALSO PRODUCED IN ELECTRONIC MEDIA,

Other forms in the series