DA Form 7805 — IINDUSTRIAL MOBILIZATION CAPACITY (IMC) REQUIREMENTS FOR MANUFACTURING FACILITIES

iindustrial mobilization capacity (imc) requirements for manufacturing facilities

Download the form

Use DA Form 7805 when you need to iindustrial mobilization capacity (imc) requirements for manufacturing facilities. Full title: IINDUSTRIAL MOBILIZATION CAPACITY (IMC) REQUIREMENTS FOR MANUFACTURING FACILITIES. Everything you need is on this page — the file, the entry rules, the routing. Edition 06/01/2018, status ACTIVE, 1 page(s), roughly 93 fields.

ASA (AL&T) is the proponent, PAM 700-90 the prescribing authority. Read the directive only if something about your situation departs from the standard case. Otherwise the form is filled by the individual it describes, or by the records clerk keeping the file, and reviewed through the printed signature blocks.

Pick by how you will enter data: PDF on offer. Typing means fillable pdf, where the boxes accept keystrokes and hold them on save. Handwriting means printable pdf, a flat page image sent straight to a printer. Neither version changes what appears on the page.

Save the download and open it in a dedicated reader. That single step prevents the common failure: an in-browser viewer accepts your typing and discards it at tab close. Confirm with one field and one save cycle before committing the whole form.

No charge, no account, no email address. The file is the published document, distributed unaltered.

What the form asks for

  • CivilianPositions
  • CommandName
  • ContentArea1
  • EXPLANATION
  • FBY1
  • FBY2
  • FBY3
  • FBY4
  • FBY5
  • FPY1
  • FPY2
  • FPY3
  • FRBY1
  • FRBY2
  • FRBY3
  • FRBY4
  • FRBY5
  • FRPY1
  • FRPY2
  • FRPY3
  • FTHBY1
  • FTHBY2
  • FTHBY3
  • FTHBY4

Header first, always. Name as your official records spell it, identification number, unit, date of preparation — these four index the finished record, and an error in them hides the document from anyone searching for it later. The substantive blocks can wait thirty seconds.

Tabbing beats clicking for coverage. The order was set at build time and tracks the page layout, so following it leaves no gaps. Boxes and buttons are clicked; where options are exclusive, one selection cancels another by design. Watch field width on long entries: one-line fields have no wrap, and what runs past the edge disappears in print though the screen still shows it. Move that text to remarks or a continuation. Never leave an inapplicable field empty — enter the nil mark, because a reviewer cannot distinguish a skipped question from a considered answer.

Sign last. An unsigned form is a draft whatever else is on it, and additional signatures — reviewer, approver, witness — follow printed block order with each signer dating the day they sign, not the day of preparation. Four faults account for most returns: a blank mandatory field, transposed digits in an identification number, day and month reversed in a date, and leftover entries in a working copy reused instead of a fresh blank. Read the form once from the top before releasing it.

The Privacy Act statement is read before the personal entries, not after. It gives the collection authority, the purpose, the routine uses and whether disclosure is mandatory or voluntary. Once filled, your copy is a personal record and gets stored and transmitted accordingly.

Routing follows PAM 700-90 and nothing else — a named office, the unit administrative channel, or the individual's file, according to why the form was raised. Copy it before it leaves. Retention is fixed by the records schedule for the series, which local practice does not shorten or extend.

Related forms are found by series and number. DA series documents under the same proponent or the same prescribing directive are commonly required as a set, and any form named on the face of this one goes forward with it. Assemble continuations, covers and transmittals before submitting, not after the query comes back.

A stored file goes stale silently. The proponent revises, a new edition date is published, and your copy says nothing about it — so compare the printed date against the edition in force before typing into it again. Completed submissions on an earlier edition are not reopened.

The files are copies of published Department of the Army forms. This site has no official connection, no authority to issue anything, and no basis for saying whether an office will accept a given submission. None of the text is legal advice. Real questions — entry, requirement, eligibility — belong with ASA (AL&T) or the administrative office servicing your unit.

Questions and answers

What is DA Form 7805?
IINDUSTRIAL MOBILIZATION CAPACITY (IMC) REQUIREMENTS FOR MANUFACTURING FACILITIES
Which edition is current?
06/01/2018
Who is responsible for this form?
ASA (AL&T)
In which formats can it be downloaded?
PDF, PDF