Download the form
The scope here is Department-wide. DD Form 375C — Production Progress Report (Continuation) — exists to Production Progress Report (Continuation), and it applies across the services rather than inside one. That is what the DD prefix encodes: joint issue, single edition, every branch and defense agency working from identical paper.
Requirement traces to not stated; the form belongs to not stated. Everything about schedule sits below that in local instruction, which is where to ask if a date matters.
Current edition is not stated, carried as not stated. Check that against any copy you already hold before doing anything else — Department-level revisions land everywhere simultaneously, so a stale file is stale across the whole Department.
Formats: PDF. Length 1 pages, approximately 23 entries.
Free download, every format. Do not fill the form in a browser tab — browser pdf viewers handle interactive fields inconsistently and discard entries on close.
What the form asks for
- Item 1. Enter report period.
- Item 2. Enter contract administration office and address, include zip code.
- Item 3. Enter purchasing office and address, include zip code.
- Item 4. Enter report number. Note, if this is a final report, so indicate by placing a capital F after the report number.
- Item 5. Enter the name and address of contractor include city state and zip code.
- Item 6. Enter name and address of plant, include city, state, and zip code.
- Item 7. Enter P I I, Contract, Number
- Item 8. Enter remarks
- Item 9. Contractor's representative. Item 9 a. Enter name as as last name comma first name comma middle initial
- Item 9 b. Enter title
- Item 9 c. Enter signature
- Item 10. Government representative. Item 10 a. Enter name as last name comma first name comma middle initial
- Item 10 b. Enter title
- Item 10 c. Enter signature
- Item 9 d. Enter date signed as 4 digit year followed by 2 digit month and 2 digit day, do not include dashes or slashes
- Enter number of this page, tab over to enter number of total pages
- Enter number of total pages
- Enter classification
- Press this Reset button to clear the data from all fields.
- Item 10 d. Enter date signed as 4 digit year followed by 2 digit month and 2 digit day, do not include dashes or slashes
- D D Form 3 75 C, Production Progress Report, continuation. March, 2000. The public reporting burden for this collection of information is estimated to average 30 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 0 7 0 4 dash 0 2 5 0, 12 15 Jefferson Davis Highway, Suite 12 04, Arlington, VA 2 2 2 0 2 dash 4 3 0 2.
- Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid O M B control number. Please do not return your completed form to this address. Return completed form as set forth in the contract.
- Form Approved. OMB No. 0 7 0 4 dash 0 2 5 0, Expires January 31, 2003.
Start by matching the printed date to not stated. Old blanks accumulate in shared folders for years. Because the Department reissues to all services in one action, nobody is still accepting the previous layout by local custom.
Unclear entries — read the form face, then not stated; the directive prevails.
Send it as not stated or local guidance specifies. Save a copy. Cross-service and cross-agency routing is normal for Department forms, and a lost original outside your own organization is harder to chase down.
A number is a complete address in the DD series. Because the sequence is Department-level and not duplicated per service, there is nothing further to specify.
Prefix before number. A DA citation and a DD citation in the same instruction point at separate systems — one Army, administered by an Army proponent, one Department-wide under not stated — and there is no correspondence between them at any number.
Three drivers of revision: directive reissue, altered collection requirements, updated statutory notice text. No notification accompanies any of them, so download fresh and confirm not stated rather than reusing an archived file.
Limits of this page: it distributes a published Department of Defense document and describes it. No legal advice, no procedural ruling, no statement about whether any submission will be accepted. Applicability, eligibility and procedure belong to not stated, to a servicing personnel office, or to the office named in not stated.
Questions and answers
- What is DD Form 375C?
- Production Progress Report (Continuation)
- Which edition is current?
- Not stated by the publisher
- Who is responsible for this form?
- Not stated
- In which formats can it be downloaded?